Glossary
The restoration glossary
70 terms from water, fire, mold, claims and field operations, defined the way a project manager would explain them to a new technician. Each term has its own link.
Water and drying
- AHAM rating
- The water removal capacity of a dehumidifier as tested under the Association of Home Appliance Manufacturers standard: pints of water removed in 24 hours at 80 degrees Fahrenheit and 60 percent relative humidity. The ANSI/IICRC S500 initial dehumidification calculation for refrigerant and low grain refrigerant units uses AHAM pints, so this is the number to compare between machines. Manufacturers also quote a higher saturation figure at hotter, wetter conditions, which should not be used for sizing.
- See also: Dehumidifier, Class of water loss
- Air mover
- A fan designed to move a high volume of air across wet surfaces so that water evaporates faster than it would in still air. Axial units push large volumes of air across floors and open rooms; centrifugal units deliver a tighter, more forceful stream for walls, carpet edges and the space under cabinets. ANSI/IICRC S500 bases the initial count on the area of wet floor, wall and ceiling, and the count is reduced at monitoring visits as materials reach their drying goals.
- See also: Evaporation, Dehumidifier, Monitoring visit, Equipment log
- Category of water
- The ANSI/IICRC S500 classification of water by its level of contamination at the source. Category 1 comes from a sanitary source such as a supply line; Category 2 carries significant contamination that can cause discomfort or sickness, such as dishwasher or washing machine discharge; Category 3 is grossly contaminated and may contain pathogens or toxins, such as sewage or rising floodwater. The category can worsen with time and temperature, and it decides protective equipment, which porous materials are removed rather than dried, and whether antimicrobials are applied.
- See also: Class of water loss, Antimicrobial, Containment
- Class of water loss
- The ANSI/IICRC S500 measure of the evaporation load in a space, which drives the initial dehumidification and air movement calculations. Class 1 is the smallest load, with wet porous materials roughly five percent or less of the combined floor, wall and ceiling area; Class 2 is roughly five to forty percent; Class 3 is more than forty percent. Class 4 is water deeply held in low-evaporation materials such as plaster, hardwood, concrete and masonry, which need specialty drying systems.
- See also: Category of water, Dehumidifier, Specialty drying systems, AHAM rating
- Containment
- Temporary barriers, usually polyethylene sheeting on a frame or zipper poles, that separate the work area from the rest of the building. On a water loss it shrinks the volume of air to be dried, creating a drying chamber that equipment can condition faster; on Category 3 water and mold work it stops contaminated air and debris from spreading, and it is paired with negative pressure. Its placement is noted on the floor plan and photographed, because it is removed before the final inspection.
- See also: Negative air machine, Category of water, Remediation, Floor plan
- Dehumidifier
- Equipment that removes water vapor from the air so that wet materials keep evaporating. Conventional refrigerant units condense moisture on cold coils and work best in warm, humid air. Low grain refrigerant (LGR) units pre-cool the incoming air so they keep removing water at much lower humidity ratios, which makes them the usual choice for structural drying. Desiccant units adsorb moisture on a silica gel rotor, work well in cold spaces, reach the driest air, and vent their moist reactivation air outside through a duct.
- See also: AHAM rating, Grains per pound (GPP), Air mover, Class of water loss
- Dew point
- The temperature at which the water vapor in the air begins to condense. Any surface colder than the dew point of the surrounding air will sweat, which is why cold windows, ducts, concrete slabs and uninsulated pipes get wet in a space that is being dried with warm, humid air. It is calculated from temperature and relative humidity and recorded with each set of psychrometric readings, so condensation damage is prevented rather than discovered.
- See also: Psychrometry, Relative humidity, Grains per pound (GPP)
- Dry standard
- The moisture content of the same material in an unaffected part of the same building or, where that is impossible, a regional reference value, as defined in ANSI/IICRC S500. It represents the normal, dry condition for that structure and climate, and it is the basis for the drying goal. It is measured on the first visit with the same meter that will be used throughout the job, and recorded with the material and the location.
- See also: Drying goal, Moisture content, Moisture meter, Equilibrium moisture content
- Drying goal
- The target moisture content, set at the start of the job, that materials must reach before the drying equipment is removed. ANSI/IICRC S500 expects the goal to be based on the dry standard for each material and to be documented before drying begins, so the end point is agreed rather than argued. Daily readings are compared with the goal, and the job is dry when the readings meet it and stay there.
- See also: Dry standard, Moisture content, Monitoring visit, Moisture map
- Equilibrium moisture content
- The moisture content a hygroscopic material such as wood or drywall settles at when it is neither gaining nor losing moisture to the surrounding air. It depends on the temperature and relative humidity of that air, so the same material has a different equilibrium in a humid coastal summer than in a dry mountain winter. This is why the dry standard is taken from the same building rather than from a table, and why drying below it has no benefit.
- See also: Dry standard, Moisture content, Relative humidity
- Evaporation
- The change of liquid water in a material into vapor in the air, which is the only way bound water leaves a material without physical removal. The rate depends on the difference in vapor pressure between the wet surface and the air, on air movement across the surface and on temperature. Air movers raise the rate, dehumidifiers take the vapor away so the difference is maintained, and heat raises both the vapor pressure at the surface and the capacity of the air.
- See also: Air mover, Vapor pressure, Dehumidifier, Extraction
- Extraction
- The physical removal of liquid water with pumps, truck-mounted or portable extractors and weighted tools that press water out of carpet and pad. Pulling water out is far faster and cheaper than evaporating it, so thorough extraction is the first step of drying and determines how much equipment is needed and for how long. The method, the areas extracted and the condition of carpet and pad are noted and photographed.
- See also: Evaporation, Class of water loss, Air mover
- Grains per pound (GPP)
- The humidity ratio expressed as grains of water vapor per pound of dry air, where 7,000 grains make a pound. Unlike relative humidity it does not change with temperature, so it is the number used to compare how much moisture is actually in the air in the affected area, an unaffected area, outdoors and at a dehumidifier's intake and exhaust. A dehumidifier that is working shows a clear drop in GPP from intake to exhaust, and the affected area should trend down from visit to visit.
- See also: Humidity ratio, Relative humidity, Psychrometry, Dehumidifier
- Humidity ratio
- The mass of water vapor in a sample of air relative to the mass of dry air in the same sample, a direct measure of how much moisture the air holds. Restoration in the United States expresses it in grains per pound; elsewhere it is given in grams per kilogram. Because it is independent of temperature, it is the value that shows whether drying equipment is actually removing water from the air.
- See also: Grains per pound (GPP), Relative humidity, Psychrometry
- Moisture content
- The amount of water held in a material. For wood it is expressed as a percentage of the material's oven-dry weight; for drywall, concrete and other materials meters report a relative or reference scale reading rather than a true percentage, so the same meter and scale must be used from the first reading to the last. Readings are compared with the dry standard and the drying goal, and they are the evidence that the structure is dry.
- See also: Moisture meter, Dry standard, Drying goal, Equilibrium moisture content
- Moisture map
- A diagram of the affected area showing where moisture readings were taken, the readings themselves and the boundary of wet material, updated at each visit. It proves that the full extent of water migration was found and shows the drying trend for each location, which is what an adjuster looks for when a job runs longer than expected. In AIFSOP, readings are logged by room and material against the floor plan, so the map builds itself from the daily entries.
- See also: Moisture content, Water migration, Floor plan, Monitoring visit
- Moisture meter
- The instrument used to measure moisture content in materials. A pin meter pushes two electrodes into the material and measures electrical resistance, giving a percentage in wood and a relative reading elsewhere; a pinless meter uses a radio frequency field to read a short distance below the surface without holes, which makes it fast for mapping but sensitive to metal and density. The same meter, scale and depth are used for the dry standard and for every later reading.
- See also: Moisture content, Dry standard, Moisture map
- Monitoring visit
- A return trip during drying to record psychrometric readings, measure moisture content at the mapped locations, confirm that every piece of equipment is running and placed correctly, and adjust or remove equipment as materials dry. ANSI/IICRC S500 expects drying to be monitored and documented at least daily until the drying goals are met, unless something else is agreed and recorded. Each visit produces the entries that make up the drying log.
- See also: Psychrometry, Moisture map, Equipment log, Drying goal
- Psychrometry
- The study of the properties of moist air: temperature, relative humidity, humidity ratio, dew point and vapor pressure, and how they relate to one another. A restorer measures temperature and relative humidity with a thermo-hygrometer and derives the rest, taking readings in the affected area, an unaffected area, outdoors and at each dehumidifier's intake and exhaust at every visit. The set of readings over time is the psychrometric log that shows the drying system was working.
- See also: Relative humidity, Grains per pound (GPP), Dew point, Vapor pressure, Monitoring visit
- Relative humidity
- The amount of water vapor in the air as a percentage of the most the air can hold at its current temperature. Because warm air can hold more vapor, heating a room lowers its relative humidity without removing any water, so it is read together with grains per pound rather than alone. Materials absorb and release moisture according to the relative humidity around them, and keeping indoor air below about 60 percent is the widely used guideline for limiting mold growth.
- See also: Grains per pound (GPP), Humidity ratio, Dew point, Equilibrium moisture content
- Specialty drying systems
- Equipment and methods used when ordinary air movers and dehumidifiers cannot reach the water: injection systems that push or pull air through wall cavities and under cabinets, floor drying mats that draw moisture out of hardwood, heat drying with directed warm air, and drying chambers that tent a small area. They are the usual answer to Class 4 losses in plaster, hardwood, concrete and masonry. Their placement, run times and results are documented separately, because carriers question them more than standard equipment.
- See also: Class of water loss, Dehumidifier, Containment
- Vapor pressure
- The pressure exerted by water vapor, in the air or at the surface of a wet material. Moisture moves from higher vapor pressure to lower, so drying works by keeping the vapor pressure of the air below that of the wet material: dehumidifiers lower the air side, heat raises the material side. It is derived from the psychrometric readings and is the physical quantity behind every drying decision.
- See also: Evaporation, Psychrometry, Dehumidifier
- Water migration
- The way water spreads from the point of release through a building: along floors and under flooring, down into the subfloor and the floor below, up walls by wicking, and into cavities and insulation. The inspection follows the water with moisture meters and often a thermal imaging camera to find the full extent, which is usually larger than the visibly wet area. The boundary is marked on the moisture map so that no wet material is left undried.
- See also: Moisture map, Moisture meter, Category of water
Fire and smoke
- Char
- Wood or other material that has been converted to carbon by burning. Charred framing has lost section and strength, so the depth of char is assessed before deciding whether a member is cleaned or replaced, and a structural engineer may be consulted on load-bearing elements. Char that stays in place holds smoke odor; it is typically removed by sanding or media blasting and then sealed.
- See also: Soot, Odor sealing, Deodorization
- Corrosion from smoke
- Smoke residues are acidic, especially from burned plastics, and combined with the moisture left by firefighting they etch glass, pit and discolor metal and attack circuit boards within hours to days. Corrosion control is therefore an emergency service: wiping and neutralizing residues on metal, appliances and fixtures, lowering humidity and applying a protective coating until full cleaning begins. Early photos of these surfaces establish what was still salvageable.
- See also: Soot, Deodorization, Wet smoke versus dry smoke
- Deodorization
- The process of removing smoke odor from a structure and its contents rather than masking it. ANSI/IICRC S700 treats it as a sequence: remove the charred and unsalvageable sources, clean every residue-bearing surface, then treat the air and the places the smoke reached with methods such as thermal fogging, hydroxyl or ozone, and finally seal surfaces that will be covered. Odor that persists after reconstruction usually means a source was missed, so each step is photographed and the customer confirms the result.
- See also: Thermal fogging, Odor sealing, Char, Soot
- HEPA vacuuming
- Vacuuming with a unit fitted with a HEPA filter so that fine soot, ash and dust are captured rather than blown back into the air. It is the first cleaning step on dry smoke residue and on any surface before wet cleaning, since rubbing dry soot into a surface sets it. In mold work the same method removes settled spores and dust from surfaces inside containment, and it is repeated after demolition before the area is wiped.
- See also: HEPA filtration, Soot, Wet smoke versus dry smoke
- Odor sealing
- Applying a sealer, often shellac or a pigmented primer, to cleaned framing, subfloor and other surfaces that will be covered during reconstruction, to lock in residual smoke odor that cleaning could not fully remove. It is the last step before rebuild, after source removal, cleaning and deodorization. Because the sealed surfaces are hidden by new finishes, the job file photographs them before they are closed in.
- See also: Deodorization, Char, Thermal fogging
- Protein smoke
- The residue left by a kitchen fire in which meat, fish or grease burned. It is nearly invisible, a thin greasy film rather than a black deposit, but it has a strong, lingering odor and discolors paint and varnish over time. Because it is detected mostly by smell, every surface in the affected rooms and often in the whole home is cleaned and deodorized, not only the surfaces that look dirty.
- See also: Soot, Deodorization, Wet smoke versus dry smoke
- Smoke web
- Strands resembling cobwebs that appear in corners, along ceilings and around fixtures after a fire. They are not spider webs but chains of charged soot particles, often from burning synthetics, that cluster and attach to surfaces, and they are easily mistaken for pre-existing dust. They are removed with dry methods, vacuuming or a dry cleaning sponge, before any wet cleaning, because wiping them smears soot into the surface.
- See also: Soot, HEPA vacuuming, Wet smoke versus dry smoke
- Soot
- The fine black carbon particles produced by incomplete combustion, carried by hot air and deposited on every surface the smoke reached, including the inside of ductwork and closed cabinets. Its character depends on what burned: dry and powdery from fast fires of wood and paper, sticky and smeary from smoldering plastics and rubber. The residue type is tested with a dry cleaning sponge on a small area and decides the cleaning method, and the spread is photographed room by room.
- See also: Wet smoke versus dry smoke, HEPA vacuuming, Corrosion from smoke, Smoke web
- Thermal fogging
- A deodorization method in which a heated fogger turns a solvent-based deodorant into a fine fog that behaves like smoke, so it reaches the cracks, cavities and pores that the smoke penetrated. It is done after cleaning, with the building vacated and smoke detectors covered, and the space is ventilated afterwards. It neutralizes residual odor rather than masking it and is often combined with other methods.
- See also: Deodorization, Odor sealing
- Wet smoke versus dry smoke
- Two kinds of residue that call for different cleaning. Wet smoke comes from slow, smoldering, low-heat fires, often of plastics and rubber, and leaves a sticky, smeary residue with a pungent odor that is difficult to clean. Dry smoke comes from fast, high-heat fires of wood and paper and leaves a dry, powdery residue that comes off with dry methods. A test with a dry cleaning sponge shows which one is present, and most fires leave some of each.
- See also: Soot, HEPA vacuuming, Protein smoke
Mold
- Amplification
- Active mold growth at a location, beyond the spores and fragments normally present in any building, almost always because a material has stayed wet long enough to support it. ANSI/IICRC S520 describes such an area as Condition 3, actual growth, whether the growth is visible or hidden behind finishes. Finding and correcting the moisture source is the first step, since growth resumes if the material becomes wet again.
- See also: Spore, Remediation, Source removal, Indoor environmental professional (IEP)
- Antimicrobial
- A product applied to a surface to kill or inhibit microorganisms such as bacteria and fungi. In water damage work it is applied after Category 2 or 3 water; in mold work it is at most a supplement to physical removal, since ANSI/IICRC S520 treats source removal, not chemical treatment, as the basis of remediation. In the United States these products are registered with the EPA and must be applied according to the label, with the product, the location and the date noted in the job file.
- See also: Category of water, Source removal, Remediation
- HEPA filtration
- Air filtration through a high efficiency particulate air filter, which by definition captures at least 99.97 percent of particles 0.3 microns in size. Air scrubbers, negative air machines and vacuums used in mold and fire work rely on it to capture spores, fragments and fine soot instead of recirculating them. Filter changes and run times are logged, because a loaded or missing filter defeats the purpose.
- See also: Negative air machine, HEPA vacuuming, Spore
- Indoor environmental professional (IEP)
- An individual qualified by training and experience to assess the fungal ecology of a building, as described in ANSI/IICRC S520; often an industrial hygienist or an environmental consultant. The IEP inspects and samples, writes the remediation protocol and performs post-remediation verification. S520 recommends that the IEP be independent of the remediation contractor, so that the same party does not both do the work and sign it off.
- See also: Post-remediation verification, Remediation, Spore, Chain of custody
- Negative air machine
- A HEPA-filtered fan that draws air from inside a containment and exhausts it outside the building through a duct, so the pressure inside is lower than outside and air leaks in through gaps rather than out. It keeps spores, dust and odors inside the work area during demolition and cleaning. The same unit run without the exhaust duct is an air scrubber. Pressure is checked with a manometer or by watching the sheeting bow inward, and run times are logged.
- See also: Containment, HEPA filtration, Remediation
- Post-remediation verification
- The inspection after mold remediation that confirms the work met the protocol before containment comes down and finishes go back. ANSI/IICRC S520 expects, at minimum, a visual check that the area is free of visible growth, dust and debris, confirmation that materials are dry, and often surface or air samples compared with reference areas. It is best performed by an indoor environmental professional independent of the remediator, and the written result is what the customer and the carrier rely on.
- See also: Indoor environmental professional (IEP), Remediation, Spore
- Remediation
- The process of removing mold contamination and returning the area to normal fungal ecology, which ANSI/IICRC S520 calls Condition 1. It includes correcting the moisture source, building containment, removing contaminated porous materials, cleaning and HEPA vacuuming what remains, and post-remediation verification. Spores are present in every building, so the aim is a clean, dry area at normal background levels rather than a sterile one.
- See also: Source removal, Containment, Post-remediation verification, Amplification
- Source removal
- The physical removal of mold growth and the materials it has colonized, rather than treating them in place. ANSI/IICRC S520 makes it the basis of remediation because dead mold is still allergenic, and because a stained or encapsulated material gives no assurance of what is underneath. Porous materials such as drywall and insulation are cut out and bagged; semi-porous and non-porous materials are cleaned by abrasion or wiping. The term also covers stopping the moisture source.
- See also: Remediation, Antimicrobial, Amplification
- Spore
- The microscopic reproductive unit of a fungus, released into the air by the thousands and present in every indoor and outdoor environment. Spores are harmless on a dry surface and grow into visible mold only when a material stays wet long enough. Air and surface sampling counts and identifies spores so that indoor results can be compared with outdoor and unaffected reference areas; ANSI/IICRC S520 describes settled spores carried from a growth area as Condition 2.
- See also: Amplification, HEPA filtration, Post-remediation verification
Insurance and estimating
- Adjuster
- The person who evaluates a claim for the insurance carrier, inspects the damage, reviews the contractor's scope and documentation and decides what the policy will pay. Staff adjusters work for the carrier, independent adjusters are hired per claim, and public adjusters represent the policyholder. Most disputes on a restoration job are settled by what the adjuster can see in the file, so photos, readings and notes should be organized with the adjuster as the reader in mind.
- See also: Adjuster portal, Scope of work, Supplement, Third-party administrator (TPA)
- Certificate of completion
- A document signed by the property owner confirming that the contracted work is finished and accepted. Carriers commonly require it, together with the final invoice, before releasing recoverable depreciation or the final claim payment, so a missing signature delays cash. It is signed at the final walkthrough, often electronically, and filed with the job record alongside the work authorization.
- See also: Depreciation and recoverable depreciation, Work authorization, E-signature
- Claim number
- The identifier the insurance carrier assigns to a loss when it is reported. Every estimate, invoice, photo set, drying log and message about the job should carry it, because the carrier and any third-party administrator file by claim number rather than by address or customer name. It is recorded on the job as soon as it is known; work started before the claim is filed is matched up afterwards.
- See also: First notice of loss, Third-party administrator (TPA), Adjuster
- Deductible
- The portion of a covered loss that the policyholder pays before the insurance carrier pays the rest. The carrier subtracts it from the claim payment, so the contractor normally collects it directly from the customer and lists it on the invoice. Offering to waive or absorb the deductible is treated as insurance fraud in many states, so it is explained to the customer up front and documented in the work authorization.
- See also: Depreciation and recoverable depreciation, Work authorization
- Depreciation and recoverable depreciation
- Depreciation is the amount the carrier deducts from the replacement cost of damaged property for age and wear; replacement cost minus depreciation is the actual cash value, which is what the carrier pays first. Recoverable depreciation is the withheld amount the policyholder can claim once the repair is actually completed and proven, usually with a final invoice and a certificate of completion. Non-recoverable depreciation is never paid, so the contractor and the customer need to know which kind applies before work starts.
- See also: Certificate of completion, Deductible, Line item
- First notice of loss
- The first report of a loss to the insurance carrier, by the policyholder or their agent, which opens the claim and produces the claim number. Restorers are often on site before or at the same time, so the date of loss, the date reported and the date mitigation started are all recorded, since carriers judge whether damage was reported and addressed promptly. The initial photos and the cause of loss documented at this point frame everything that follows.
- See also: Claim number, Adjuster, Work authorization
- Line item
- A single entry in an estimate or invoice: a description of one task or material, a quantity, a unit and a unit price. Carriers review an estimate line by line, usually in an estimating platform such as Xactimate, so the drying log, the equipment log and the photos need to support each one, for example the number of air movers multiplied by the number of days. Items that were not in the approved estimate go into a supplement.
- See also: Scope of work, Supplement, Equipment log
- Mitigation versus restoration versus reconstruction
- Mitigation is the emergency work that stops the loss from getting worse: extraction, drying, removing unsalvageable materials and securing the structure. Restoration is the cleaning and repair that returns salvageable materials and contents to their pre-loss condition. Reconstruction, or put-back, rebuilds what was removed. Carriers treat them as separate phases with separate estimates and often separate authorizations, and a company may perform one, two or all three.
- See also: Scope of work, Work authorization, Extraction
- Pre-existing condition
- Damage or deterioration that was present before the reported loss, such as old water stains, prior mold growth, rot or deferred maintenance. It is not covered by the claim, so it must be identified and photographed at the first inspection, before any demolition, and described separately in the scope. Without that record, the contractor is drawn into a dispute months later over which damage the carrier owes.
- See also: Scope of work, Adjuster, First notice of loss
- Scope of work
- The written description of what will be done on a job: which rooms are affected, which materials are removed and which are dried or cleaned, what equipment is placed and for how long, and what is rebuilt. It is the basis for the estimate and the work authorization, and anything found later that changes it becomes a supplement. A scope that matches the photos and the moisture map is approved quickly; one that does not is questioned line by line.
- See also: Line item, Supplement, Work authorization, Moisture map
- Supplement
- A request to the carrier for payment beyond the approved estimate, for work that could not be known at the start: hidden damage behind finishes, extended drying, code-required upgrades or a change in the category of water. It is submitted with the photos, readings and notes that justify each added line item, and it is approved or negotiated by the adjuster. Supplements written from the daily record get approved; supplements written from memory do not.
- See also: Line item, Scope of work, Adjuster
- Third-party administrator (TPA)
- A company that handles claims or runs a contractor network on behalf of an insurance carrier. Program work assigned through a TPA comes with its own rules: response and contact times, required photos and drying documentation, pricing guidelines, uploads to the TPA's own system and scorecards that decide whether a contractor keeps receiving jobs. The TPA's reference number is recorded alongside the carrier's claim number.
- See also: Claim number, Adjuster, Dispatch
Operations and technology
- Adjuster portal
- A secure web view that gives the insurance adjuster direct access to the parts of a job they need in order to approve it: the scope, drying logs, photos, equipment records and invoices. It replaces e-mail threads of attachments and lets the adjuster check progress without calling the office. Access is scoped to the claim, and what the adjuster viewed and when is recorded in the job's activity.
- See also: Adjuster, Customer portal, Tamper-evident audit trail
- Chain of custody
- A documented record of who had possession of an item, when it changed hands and what was done to it, with no gaps. Restorers use it for mold or asbestos samples sent to a laboratory, for contents and personal property removed from a home, and for evidence such as photographs and reports that may be examined in a claim dispute. Each hand-off is signed and timed, and a digital audit trail serves the same purpose for electronic records.
- See also: Tamper-evident audit trail, Indoor environmental professional (IEP)
- Customer portal
- A web page for the property owner showing the status of their job, photos, documents and invoices, where they can sign authorizations, approve estimates and pay. It answers the questions that otherwise arrive as phone calls, such as whether a crew is coming today and what the drying equipment is doing. Each view and signature is recorded, so the file shows what the customer was told and when.
- See also: Adjuster portal, E-signature, Work authorization
- Dispatch
- Assigning crews, vehicles and equipment to jobs and getting them moving, from the first emergency call through the daily monitoring visits. Response times matter: carriers and third-party administrator programs expect the customer to be contacted and the crew to be on site within set windows, and those times are reported. A dispatch board shows who is where, and the assignment reaches the technician as a notification with the address, the contact and the tasks.
- See also: Route planning, Third-party administrator (TPA), Time entry
- E-signature
- A signature captured electronically, on a technician's phone screen or through a link sent to the signer, that binds the signer to the document in the same way as ink. United States federal law (ESIGN) and most state law (UETA) recognize it, provided the record shows who signed, what they signed and when. Work authorizations, change orders and certificates of completion are signed this way, and the signature record carries the signer, the timestamp and the device.
- See also: Work authorization, Certificate of completion, Tamper-evident audit trail
- Equipment log
- The record of every piece of drying or air filtration equipment used on a job: the type, the asset or serial number, the room it was placed in, the dates and times it was placed, checked and removed, and who did it. It is the basis for billing equipment days and the proof that the drying plan was carried out as documented. Scanning a barcode or asset tag at placement and pickup keeps the log accurate and stops equipment going missing.
- See also: Air mover, Dehumidifier, Monitoring visit, Line item
- Floor plan
- A scaled drawing of the affected rooms with wall lengths, openings and ceiling height. It gives the square and cubic footage behind equipment calculations and estimate quantities, and it is the canvas on which moisture readings, equipment placement and containment are marked. It can be produced from a LiDAR scan or from tape measurements, and carriers expect a sketch with the estimate.
- See also: LiDAR, Moisture map, Equipment log, Line item
- Geofence
- A virtual boundary drawn around a job site, typically a radius around the address, against which a device's location is checked. When a technician clocks in, the time entry records whether the phone was inside the boundary, and a clock-in from somewhere else is flagged for review rather than silently accepted. In AIFSOP, a geofence miss raises an alert on the dashboard with a one-tap way to resolve it.
- See also: Time entry, Breadcrumb (GPS)
- Job hub
- The single screen or record where everything about one job lives: the timeline, photos, moisture readings, floor plans, equipment, forms, notes, expenses, customer communication and the final sign-off. It exists so that nobody on site switches between several apps or re-enters data at the office, and so that the claim file can be assembled from one place. In AIFSOP, the job hub is the per-job view shared by the iOS app and the web app.
- See also: Offline-first sync, Equipment log, Moisture map, Time entry
- LiDAR
- Light Detection and Ranging: a sensor that emits laser pulses and measures the time they take to return, building a three-dimensional model of the space. The Pro models of iPhone and iPad carry one, so a technician can scan a room and get walls, openings and square footage without a tape measure or a separate sketching app. The accuracy is sufficient for estimate quantities and equipment sizing; it is not a survey instrument, and the scan is attached to the job as the source of the floor plan.
- See also: Floor plan, Moisture map
- Offline-first sync
- A design for field software in which the phone is the primary store: every photo, reading, note and clock event is saved on the device first and sent to the server when a connection exists. Restoration work happens in basements, burned structures and rural areas where no signal is the normal case, so the app must not depend on one. Each queued write carries an identifier so that a retry never duplicates a record; in AIFSOP, the iOS app queues everything on the phone and syncs when the connection returns.
- See also: Job hub, Breadcrumb (GPS), Time entry
- Route planning
- Ordering the day's stops for each technician or crew so that monitoring visits, new losses and equipment pickups are reached with the least driving, in the order their priority and time windows require. A dry-out that needs a daily check cannot be skipped because it was out of the way, so the plan starts from what each job needs that day and then arranges the drive. The planned route is compared with the GPS breadcrumb afterwards.
- See also: Dispatch, Breadcrumb (GPS), Monitoring visit
- Tamper-evident audit trail
- A permanent log of every action on a record, with who did it, when and what changed, built so that any later alteration of a record or of the log itself can be detected, typically by hashing each entry. In a claim dispute months after the job, it shows that a photo, a reading or a signature existed at the time stated. In AIFSOP, documents are hashed and every field action is logged with the user, the timestamp and its context.
- See also: E-signature, Chain of custody, Time entry
- Time entry
- A record of the time a technician worked on a job: the clock-in and clock-out timestamps, the job and task, and the location of the device at each event. Time entries feed payroll, job costing and the labor line items on the invoice, so an entry that is missing or edited after the fact affects all three. Edits are logged with who changed them and why.
- See also: Geofence, Breadcrumb (GPS), Line item, Tamper-evident audit trail
Put the numbers to work
- Air mover calculatorAir movers per room from the IICRC worksheet, low and high range, with the lower-wall alternative and standing-water gallons.Open
- Dehumidifier calculatorPints per day and unit count from room volume and class, using the IICRC initial dehumidification factors for conventional, LGR and desiccant units.Open
- Psychrometric calculatorGPP, dew point and vapor pressure from temperature and RH, and the grain depression across a dehumidifier.Open
Every term above is a field in the job record
Category and class per area, GPP per reading, equipment per room, the supplement with its photos. 30-day free trial, no card.