A restoration job starts with a drawing. Someone has to know how big the room is, how much of it is wet, and what volume of air the dehumidifiers will be working against. That drawing feeds the estimate, the equipment count, the drying plan and the claim file. Get it wrong and every number downstream is wrong with it.
For most of the trade's history that drawing came from a tape measure and a clipboard. A depth sensor on a phone now captures a whole room in one walk-through, and the numbers an adjuster needs come out of that walk.
What a restoration sketch has to carry
An insurance sketch is not a floor plan in the architectural sense. It is a measured record of the loss. At a minimum it carries:
- Room dimensions for every affected room, wall by wall.
- Square footage of floor, ceiling and each wall, because drywall, paint and flooring are priced by area.
- Perimeter and linear feet for baseboard, trim and the line items that run along a wall.
- Ceiling height, which turns area into volume and changes the wall surface math.
- Cubic volume, the number the dehumidification worksheet starts from.
- Doors and windows, with their sizes, so openings are subtracted from wall area.
- Affected areas, marked so the reader can see what was wet and what was removed.
- Moisture points, located on the plan, with readings over time.
Everything on that list is a measurement or something placed on one. The sketch sets the ceiling on the quality of the estimate.
How it was done before
A technician measures the room with a tape or a laser measure while a second person writes. Someone draws the room on graph paper or a tablet. Back at the office an estimator redraws it in the estimating program, types in the dimensions, adds the openings and computes the areas. Time and errors come from the same places:
- Measuring takes two people, or one person crossing the room many times, for every room on the loss.
- Ceiling height is measured once and assumed everywhere, or not measured at all. Openings are sketched but not sized.
- Numbers are transposed between the tape, the notepad and the keyboard. A 12 foot 6 inch wall becomes 16 foot 2 inch, and nobody notices until the material order is wrong.
- The office redraw happens days later, by someone who was not in the room. Irregular rooms and closets get simplified into rectangles.
How LiDAR on a phone works, in plain terms
LiDAR stands for light detection and ranging. The sensor sends out pulses of infrared light and times how long each one takes to bounce back. That time gives a distance. It does this for a grid of points at once, many times a second, so it sees the room as a cloud of distances rather than a flat picture.
On its own that cloud is a snapshot from one spot. The phone combines it with the camera and with the motion sensors that track how the phone moves. As you walk the room, the software stitches each snapshot onto the last. The result is a 3D mesh: a continuous surface of small triangles that follows the walls, floor, ceiling and whatever is in the way.
The floor plan comes from reading that mesh. Large flat vertical surfaces are walls. Where two walls meet is a corner. Gaps at door height are doors; gaps at window height are windows. Ceiling height comes from the two large horizontal surfaces. Once the walls are known, perimeter, area, wall count and volume are arithmetic. Its range is a few meters, which is why you walk the room rather than scan it from the doorway.
Which devices have the sensor
Apple has put the LiDAR scanner only on its Pro line. The iPhone 12 Pro and 12 Pro Max were the first, and every Pro and Pro Max model since has carried it. The iPad Pro has had it since 2020. The standard iPhone, the Plus models and the lower-priced models do not have it.
What accuracy to expect in practice
In an ordinary furnished room with painted drywall, a careful scan lands close to what a tape measure would give for the overall room dimensions. For a sketch priced in square feet and linear feet rather than fractions of an inch, that is usually good enough. Accuracy falls off in predictable situations:
- Glass and mirrors. The pulse goes through glass or bounces off a mirror and reports the distance to whatever is behind or reflected. A mirrored closet door can read as a second room.
- Very dark or very bright surfaces. Matte black finishes absorb the pulse; direct sunlight swamps the return. Both leave holes in the mesh.
- Long open spaces. Warehouses and long hallways exceed the sensor's range and the phone's ability to track its own position, so error accumulates along the length.
- Cluttered rooms. Contents and equipment hide the wall behind them. The software has to guess where the wall is, and it may guess wrong.
- Fast movement and low light. Swinging the phone blurs the camera frames the tracking relies on, and a dark basement starves the camera side even though the LiDAR itself does not need light.
A scanning routine that holds up
A repeatable routine matters more than the device:
- Clear a path. You do not need to empty the room, only to see each wall from a few feet away.
- Start at a corner. Face along a wall and hold still for a moment. The first few seconds set the frame everything else is stitched to.
- Pan slowly and steadily. Sweep the wall from floor to ceiling, step sideways, repeat.
- Cover every wall, including behind the door. Go around the full perimeter and end where you started so the software can close the loop.
- Include the openings. Pause at each door and window. Scan into closets and alcoves rather than skipping them.
- Capture the ceiling and floor. Tilt up and down from the middle of the room so the height comes from the scan, not from an assumption.
- Check the result before you leave. Count the walls, compare one wall against a tape or laser, and confirm the doors and windows landed where they are.
- Rescan when needed. A missing wall, a rounded corner or a wrong height means scan again. A second scan takes a minute. A trip back takes an afternoon.
The scan should run inside the job record, not in a separate app. In the AIFSOP iOS app it is started from the job, so the floor plan lands next to the photos and the moisture readings for that room.
From scan to estimate and drying plan
The sketch has two customers. The estimator needs floor area, ceiling area, wall area net of openings, and perimeter by room, the quantities the line items are built on. The estimator still decides what is affected and what the scope is, but the measurements are no longer typed in from a notepad.
The drying plan needs cubic volume. The IICRC S500 worksheet sizes initial dehumidification by dividing the cubic feet of the drying chamber by a factor that depends on the class of water loss and the type of dehumidifier. The result is the pints per day the chamber needs. A room 12 feet by 15 feet with an 8 foot ceiling is 1,440 cubic feet. Divide by the factor for the class and the dehumidifier type and you have the starting target before anyone sets a unit.
That arithmetic only works if the volume is right. A ceiling assumed at 8 feet that is actually 9 feet understates the volume by more than a tenth. In AIFSOP the area and volume from the scan feed the equipment calculation directly, so the technician sees a dehumidifier and air mover count computed from the room they are standing in.
Moisture mapping on the plan
A floor plan with dimensions is a sketch. A floor plan with moisture readings on it is a drying record. Each reading is a point on the plan, with the material, the meter reading and the time. The first visit sets the baseline: a dry standard taken on the same material in an unaffected area, and a drying goal set from it. Every return visit adds a reading at the same points. Plotted over days, each point trends toward the goal, stays flat, or rises. That trend justifies the equipment staying on site or coming off.
On the scanned plan the points show where the wet area sits in relation to the walls and openings, which matters when moisture is migrating. A missed reading is also obvious: values on day one and day two and nothing on day three stand out on a drawing in a way they do not in a table.
Sharing with adjusters
An adjuster reviewing a water claim wants to confirm that the equipment count matches the room, that the affected area matches the photos, and that the drying was monitored and finished. A scanned plan with dimensions, marked affected areas and dated moisture points answers all three on one page, provided the plan, the readings and the photos are views of the same record rather than three attachments assembled by hand. In AIFSOP the plan is in the adjuster portal next to the drying log and the photo set, so the reviewer sees the same room the technician scanned.
Limits, and when to measure by hand
A scan is a good default, not a universal one. Measure or verify by hand when:
- The room has mirrored walls, a glass wall or large windows at eye level.
- The space is long and open, or the loss spans a large commercial floor.
- A dimension drives a high-value line item and a tape check costs thirty seconds.
- The room is dark and cannot be lit, or is packed with contents.
- The phone is not a Pro model. Photo-based measurement exists, but treat it as a drawing aid rather than a measurement.
A laser distance measure stays on the truck for these cases, and the scan and the laser disagreeing is itself useful information.
Where the plan lives
A floor plan is evidence. Store it like the photos and the readings: attached to the job, dated, attributed to the person who captured it, and kept as long as the claim file is kept. A plan that lives in a scanning app on one technician's phone is not in the job record. If a room is scanned twice, keep both with their times rather than overwriting the first. Treat the plan as the customer's data: it describes the inside of someone's home and travels only with the rest of the claim file.
Three ways to measure a room
| Method | Time per room | Accuracy | What it captures | Training cost |
|---|---|---|---|---|
| Tape and hand sketch | Longest; often two people | Depends on the person and the day | The lengths someone wrote down; openings often unsized | Low to learn, high to do consistently |
| Laser measure and sketch | Shorter; one person | Good per wall; errors in transcription and drawing | Wall lengths and height; openings and shape still drawn by hand | Low |
| LiDAR scan | Shortest for ordinary rooms | Close to tape for room dimensions; weaker on glass, dark or cluttered spaces | Walls, openings, height, area, perimeter, volume, and a plan to mark up | A routine to learn, and a Pro device |
Where this leaves the sketch
The floor plan has always been the foundation of the file. What has changed is that one person can capture it in a few minutes, check it on the spot, and carry it straight into the equipment math and the drying record without retyping. The sensor does not replace judgment about class, scope or what is affected. It removes the retyping, and with it the errors that came from retyping.